Close Menu
    Trending
    • JPrime Buildcon’s Grand Business Meet ‘Sankalp 2025’ Marks a New Chapter in Mumbai 3.0 Growth Story
    • Famous writer Chetan Bhagat Launches World of Basalt Reinforcement by Mahesh Kumar Jogani
    • Introducing Hidoc Dr KOL Factory The Future Hub for Oncology Leaders Worldwide
    • Surat’s Diamond Shines at Las Vegas: Govindkaka Felicitated at JCK Las Vegas
    • Islene Island System by Hafele
    • Patil Automation Limited IPO Opens on June 16, 2025
    • Apollo Hospitals Hyderabad Sets New Benchmark with AHA Comprehensive Chest Pain Centre Certification
    • Celebs, Business and Beyond: How The Centrum Hotel Lucknow Became a New Luxury Landmark in India 2025
    Republic News TodayRepublic News Today
    • Business
    • Entertainment
    • Education
    • Health
    • Lifestyle
    • National
    • World
    • Press Release
    Republic News TodayRepublic News Today
    Home»Press Release»AVP Infracon Secures Rs 16.23 Cr Infrastructure Order for Road Over Bridge Construction in Tamil Nadu
    Press Release

    AVP Infracon Secures Rs 16.23 Cr Infrastructure Order for Road Over Bridge Construction in Tamil Nadu

    By June 12, 2025No Comments3 Mins Read
    Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit WhatsApp Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Chennai (Tamil Nadu) [India], June 12: AVP Infracon Limited (NSE – AVPINFRA), a prominent player in the Indian infrastructure development sector, has announced the receipt of a Letter of Acceptance (LoA) from the Superintending Engineer, Highways NABARD & Rural Roads Circle, Salem-7. The order pertains to the construction of a Road Over Bridge (ROB) at Km 0/6 of Thaneerpandal Road, replacing the existing Level Crossing No. 6 located between Singanallur and Peelamedu railway stations in Tamil Nadu.

    The contract, awarded by a domestic government entity, carries a total value of approximately ₹16.23 Cr. As per the terms of the agreement, the project is scheduled for completion within a timeframe of 18 months from the commencement date.

    This development marks a significant addition to AVP Infracon’s growing portfolio of transportation infrastructure projects and underscores the company’s continued presence in critical road and bridge construction initiatives across southern India. The new ROB is expected to ease traffic congestion, enhance commuter safety, and facilitate smoother connectivity between the Singanallur and Peelamedu regions, which are vital transit points within the Coimbatore urban agglomeration.

    AVP Infracon Limited has built a robust reputation for executing infrastructure projects across highways, bridges, and civil construction sectors. The company’s focus on timely delivery, engineering excellence, and compliance with stringent quality standards has positioned it as a reliable partner for public infrastructure development in the country.

    The newly awarded project aligns with the government’s broader agenda to modernize transportation networks and improve rural and urban connectivity through enhanced road infrastructure. With this contract, AVP Infracon strengthens its role in supporting regional development and contributing to long-term mobility solutions in Tamil Nadu.

    Commenting on the receipt new order, Mr. Prasanna Dhandayuthapani, MD of AVP Infracon Limited, said, “We are pleased to announce the receipt of the Letter of Acceptance for the construction of a Road Over Bridge, awarded to us by the Superintending Engineer, Highways NABARD & Rural Roads Circle, Salem-7. This order further strengthens our position as a trusted execution partner for state infrastructure agencies and highlights our expanding footprint in Tamil Nadu’s road development landscape.

    This project is aligned with our long-term vision to contribute meaningfully to the state’s mission of building safe, sustainable, and future-ready infrastructure. At AVP Infracon, we remain committed to delivering high-quality infrastructure assets through our strong technical capabilities, rigorous project execution, and a dedicated workforce.

    Our team is fully prepared to complete this project within the stipulated 18-month timeline, upholding the highest standards of engineering excellence, safety, and compliance. We are grateful to the authorities for their continued trust in AVP Infracon Limited and look forward to playing a continued role in Tamil Nadu’s infrastructure growth journey.”

    If you object to the content of this press release, please notify us at [email protected]. We will respond and rectify the situation within 24 hours.

    PR press release
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
    Previous ArticleIndia Celebrates 11 Years of Infrastructure Revolution Under PM Modi’s Vision
    Next Article Producer Director Ajay Ram’s OTT Platform ‘CRF Studios’ Launched

    Related Posts

    Introducing Hidoc Dr KOL Factory The Future Hub for Oncology Leaders Worldwide

    June 13, 2025

    Islene Island System by Hafele

    June 13, 2025

    Patil Automation Limited IPO Opens on June 16, 2025

    June 13, 2025
    Recent Posts
    • JPrime Buildcon’s Grand Business Meet ‘Sankalp 2025’ Marks a New Chapter in Mumbai 3.0 Growth Story
    • Famous writer Chetan Bhagat Launches World of Basalt Reinforcement by Mahesh Kumar Jogani
    • Introducing Hidoc Dr KOL Factory The Future Hub for Oncology Leaders Worldwide
    • Surat’s Diamond Shines at Las Vegas: Govindkaka Felicitated at JCK Las Vegas
    • Islene Island System by Hafele
    • Patil Automation Limited IPO Opens on June 16, 2025
    • Apollo Hospitals Hyderabad Sets New Benchmark with AHA Comprehensive Chest Pain Centre Certification
    • Celebs, Business and Beyond: How The Centrum Hotel Lucknow Became a New Luxury Landmark in India 2025
    • Aamukh Capital Launches with First Investment in GoodGudi, Backing Bold Indian Founders at Inception
    • “Reality Shift Through Energy Work” Neelam Naseeb’s Global TEDx Impact

    Type above and press Enter to search. Press Esc to cancel.