Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Best Crypto Presale 2026: AlphaPepe Set to Dominate Markets with Second CEX Partnership Reveal This Saturday
    • Is Your Child Developing Normally? Early Signs of Autism, ADHD and Learning Disabilities — When to See a Child Psychologist
    • FareArena Reveals the Most Popular Travel Destinations Worldwide
    • Hyderabad Creates History with World’s Largest Djembe Drum Circle; Guinness World Record Attempt Held Successfully
    • Accel Skill Builds Structured Talent Mobility Pathway Linking Indian Nurses to Europe’s Healthcare Demand — Powered by a Unique Centre of Excellence Model
    • Phoenix Shopping Festival 2026 Sets the Stage for Pune’s Biggest Shopping Season
    • Best Crypto Presale of the Cycle? AlphaPepe Eyes Massive Liquidity Boost With First Confirmed Azbit Listing
    • India Book of Records’ Award-Winning Film Promoted in Japan
    Republic News Today
    • Business
    • Entertainment
    • Lifestyle
    • National
    • Technology
    • Education
    Republic News Today
    Home»Business»SEPC Secured INR 269.68 Crore Sub-Contract for Strategic Ajmer-Chanderiya Railway Doubling Project
    Business

    SEPC Secured INR 269.68 Crore Sub-Contract for Strategic Ajmer-Chanderiya Railway Doubling Project

    Arjun SinghBy Arjun SinghDecember 16, 2025No Comments2 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Reddit WhatsApp Email
    Share
    Facebook Twitter LinkedIn Pinterest WhatsApp Email

    Chennai (Tamil Nadu) [India], December 16: SEPC Limited (NSE: SEPC | BSE: 532945), one of India’s leading Engineering, Procurement and Construction (EPC) companies with a diversified presence across Water & Municipal Services, Roads, Industrial Infrastructure, and Mining, has secured a railway infrastructure project valued at ₹269.69 crore under the Ajmer–Chanderiya Doubling Project of the Ajmer Division, North Western Railway (NWR).

    The project has been awarded to the VPRPL–SBEL Joint Venture, with SEPC Limited responsible for execution of the project works under the control and supervision of the Joint Venture, in line with the Letter of Award issued by North Western Railway.

    Project Scope of Work

    The scope of the project includes comprehensive formation and civil works across the Mandpiya (including) to Chanderiya (including) section, comprising:

    • Earthwork in embankment filling, cutting, and blanketing
    • Construction of important, major, and minor bridges
    • Road under bridges (RUBs) / limited height subways
    • Foot over bridges and trolley refuges
    • Toe walls, retaining walls, pitching, and side drains
    • Construction of station buildings and allied service buildings
    • Platform works, platform shelters, and staff quarters
    • Permanent way (P-Way) works including supply of ballast, transportation of P-Way material, and laying and linking of broad-gauge track
    • Miscellaneous works including general electrical works

    The project forms part of Indian Railways’ capacity augmentation initiatives aimed at improving operational efficiency and connectivity on key routes.

    Strategic Impact

    The ₹269.69 crore order further strengthens SEPC’s transportation infrastructure order book and reinforces its growing presence in the railway EPC segment. The project adds to SEPC’s expanding portfolio across India, while supporting balanced growth across its core infrastructure verticals.

    Commenting on the order win Mr. Venkataramani Jaiganesh, Managing Director of SEPC Limited, said: “This project reinforces SEPC’s execution capabilities in large-scale railway infrastructure works and reflects the confidence placed in our technical and delivery strengths. Railways remain a key focus area for the Company, and our role in executing this project under North Western Railway further strengthens our transportation infrastructure portfolio. We continue to see steady momentum across infrastructure segments in India, supported by disciplined project selection and execution.”

    If you have any objection to this press release content, kindly contact pr.error.rectification@gmail.com to notify us. We will respond and rectify the situation in the next 24 hours.

    Business
    Arjun Singh
    • Website

    Related Posts

    Phoenix Shopping Festival 2026 Sets the Stage for Pune’s Biggest Shopping Season

    June 22, 2026

    Phoenix Mall of the Millennium Welcomes Pune’s Elite for a Curated Evening of Fashion, Style and Elegance

    June 22, 2026

    The Pet Parenting Ecosystem India Has Been Waiting For: WAGR

    June 22, 2026

    Comments are closed.

    Recent Posts
    • Best Crypto Presale 2026: AlphaPepe Set to Dominate Markets with Second CEX Partnership Reveal This Saturday
    • Is Your Child Developing Normally? Early Signs of Autism, ADHD and Learning Disabilities — When to See a Child Psychologist
    • FareArena Reveals the Most Popular Travel Destinations Worldwide
    • Hyderabad Creates History with World’s Largest Djembe Drum Circle; Guinness World Record Attempt Held Successfully
    • Accel Skill Builds Structured Talent Mobility Pathway Linking Indian Nurses to Europe’s Healthcare Demand — Powered by a Unique Centre of Excellence Model
    Search
    Recent Posts
    • Best Crypto Presale 2026: AlphaPepe Set to Dominate Markets with Second CEX Partnership Reveal This Saturday
    • Is Your Child Developing Normally? Early Signs of Autism, ADHD and Learning Disabilities — When to See a Child Psychologist
    • FareArena Reveals the Most Popular Travel Destinations Worldwide
    • Hyderabad Creates History with World’s Largest Djembe Drum Circle; Guinness World Record Attempt Held Successfully
    • Accel Skill Builds Structured Talent Mobility Pathway Linking Indian Nurses to Europe’s Healthcare Demand — Powered by a Unique Centre of Excellence Model
    • Phoenix Shopping Festival 2026 Sets the Stage for Pune’s Biggest Shopping Season

    Type above and press Enter to search. Press Esc to cancel.