Close Menu
    Trending
    • 7 Fin Digital Lending Launches in Surat: 30-Min Credit Cards & Loans
    • All India Institute of Occult Science: Bringing Positive Change Through Ancient Indian Knowledge
    • Landmark TRIC Valve Implantation at Dana Shivam Heart & Superspeciality Hospital, Jaipur by Dr Sunil Garssa
    • Sarvjanik Education Society Honours 10th & 12th Toppers, Principals, and Teachers
    • AM/NS India Powers Two of India’s Greatest Rail Engineering Marvels
    • Anusaya Fresh India Unveils Eco-Friendly Cardboard Packaging for Q-Commerce
    • Morari Bapu Becomes An Inspiration For Environmental Action
    • Harvesting Dignity, Delivering Freshness: DailyGurus Builds a New Agri-Economy for India’s Villages
    Republic News TodayRepublic News Today
    • Business
    • Entertainment
    • Education
    • Health
    • Lifestyle
    • National
    • World
    • Press Release
    Republic News TodayRepublic News Today
    Home»Business»KP Energy receives NoA from NTPC REL for 464.10 MW BoS package for wind energy project in Gujarat
    Business

    KP Energy receives NoA from NTPC REL for 464.10 MW BoS package for wind energy project in Gujarat

    By October 2, 2023No Comments2 Mins Read
    Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit WhatsApp Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Surat (Gujarat) [India], October 2: KP Energy Limited, a leading player in the renewable energy sector, has achieved a significant milestone by receiving a Notification of Award (NOA) from NTPC Renewable Energy Limited (NTPC REL) for a 464.10 MW Balance of System Package. This package is part of an Inter-State Transmission System (ISTS) Connected Wind Energy project in Gujarat.

    KP Energy clinched the contract from NTPC REL, a subsidiary of NTPC, through a rigorous and highly competitive bidding process, reaffirming its excellence in the renewable energy domain. The project falls under the company’s Captive Power Producer (CPP) business segment.

    Under the contracts, KP Energy will provide a comprehensive suite of services, including Engineering, Procurement, Construction, and Commissioning (EPCC). These services encompass the acquisition and transfer of land for the project, the supply of all necessary equipment for the balance of plant, and the provision of various services related to unloading, storage, on-site handling, installation, insurance, civil and allied works, integration into the grid, testing, and commissioning. Additionally, the company will be responsible for the operation and maintenance of the contract scope for three years, ensuring its optimal performance and reliability.

    Dr. Faruk G Patel, Chairman and Managing Director of KP Group, said, “We are thrilled to receive the Notification of Award for this vital project from NTPC REL. It underscores our strong presence in the renewable energy sector and our expertise in the timely execution of challenging projects. The project aligns with our mission to contribute to sustainable energy solutions and reflects the trust clients have in our project execution capabilities. KP Group remains committed to delivering high-quality renewable energy projects that contribute to India’s green energy goals and promote a cleaner and greener future.”

    As per the contract, the project is slated to be completed within 21 months from the date of the NOA.

    Earlier, KP Energy successfully commissioned a 29.4MW (Phase-II) ISTS-connected wind power project comprising 14 WTGs of 2.1 MW each at Sidhpur site in Devbhumi Dwarka.

    Business
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
    Previous ArticleDevising innovative launch of Polar projects in Mumbai: World’s First Augmented Reality based website
    Next Article A New Dawn for Women in Politics: Dr. Ranjana Kumari’s Relentless Pursuit for Equality

    Related Posts

    AM/NS India Powers Two of India’s Greatest Rail Engineering Marvels

    June 7, 2025

    Marketing Veteran Rahul Goyal Launches Nuvoraa to Serve Brands Beyond Real Estate

    June 7, 2025

    Indha: Redefining Sustainability Through Design Innovation; Training Rural Women To Become Eco-Entrepreneurs

    June 7, 2025
    Recent Posts
    • 7 Fin Digital Lending Launches in Surat: 30-Min Credit Cards & Loans
    • All India Institute of Occult Science: Bringing Positive Change Through Ancient Indian Knowledge
    • Landmark TRIC Valve Implantation at Dana Shivam Heart & Superspeciality Hospital, Jaipur by Dr Sunil Garssa
    • Sarvjanik Education Society Honours 10th & 12th Toppers, Principals, and Teachers
    • AM/NS India Powers Two of India’s Greatest Rail Engineering Marvels
    • Anusaya Fresh India Unveils Eco-Friendly Cardboard Packaging for Q-Commerce
    • Morari Bapu Becomes An Inspiration For Environmental Action
    • Harvesting Dignity, Delivering Freshness: DailyGurus Builds a New Agri-Economy for India’s Villages
    • Bank of Maharashtra’s P. Ananya Sree to Represent India in the 2025 AVC Women’s Nations Cup
    • Cybersecurity in the Insurance Sector- By: Lakshya Mehta

    Type above and press Enter to search. Press Esc to cancel.